Gorgon Oil and Gas: Project, Location, and Facts

Updated November 24, 2026

Gorgon oil and gas refers to the Gorgon Project, one of the world’s largest natural gas projects, located on Barrow Island off the northwest coast of Australia. It is a liquefied natural gas (LNG) and domestic gas venture operated by Chevron, with major partners ExxonMobil and Shell, and it has been producing since 2016.

Background and Scale

The Gorgon Project is named after the Gorgon gas field, which lies about 130 kilometers (80 miles) off the Pilbara coast of Western Australia. The field was discovered in 1980, but development only began in earnest in 2009 after decades of technical and economic planning. The project includes a three-train LNG facility on Barrow Island, a Class A nature reserve, and a subsea pipeline network connecting multiple gas fields.

The scale is enormous: the LNG plant can produce about 15.6 million tonnes per year, and the project also supplies domestic gas to Western Australia. The total investment exceeded US$50 billion, making it one of the most expensive resource projects ever built in Australia. The first LNG cargo shipped in March 2016, and the third train came online in 2017.

How the Gas Is Extracted and Processed

Natural gas is extracted from reservoirs beneath the seabed, primarily the Gorgon and Jansz-Io fields. The gas is a mix of methane, ethane, and other hydrocarbons, along with carbon dioxide (CO2) and water. The process involves:

  • Drilling wells from offshore platforms and subsea wells, with flowlines bringing the gas to Barrow Island.
  • Removing water, mercury, and other impurities at onshore processing facilities.
  • Separating CO2 and compressing it for injection into a deep geological formation beneath Barrow Island.
  • Cooling the purified gas to about -162°C (-260°F) to turn it into LNG for shipping.

LNG is loaded onto specialized tankers and exported mainly to Japan, China, and South Korea under long-term contracts. Domestic gas is piped to the mainland via a 70-kilometer pipeline.

Environmental Measures and CO2 Injection

A defining feature of Gorgon is its carbon capture and storage (CCS) system, one of the largest in the world. The project was designed to inject up to 4 million tonnes of CO2 per year into the Dupuy Formation, a saline aquifer about 2 kilometers below the island. This was a condition of environmental approval because Barrow Island is a nature reserve with unique flora and fauna.

However, the CCS system has faced operational problems. Injection began in 2019, later than planned, and the system has repeatedly underperformed. By 2023, the project had injected only a fraction of the expected volumes, and Chevron has acknowledged technical challenges with the injection wells. This has led to criticism from environmental groups and higher-than-expected emissions from the project.

Common Problems and Controversies

Beyond CCS issues, the Gorgon Project has had several public controversies:

  • Cost overruns: The budget ballooned from an initial estimate of around US$37 billion to over US$50 billion, partly due to labor costs and engineering complexity.
  • Industrial disputes: Construction involved thousands of workers, leading to strikes and delays.
  • Environmental incidents: In 2018, a leak from a pipe on Barrow Island released a small amount of condensate, and there have been several minor spills.
  • Greenhouse gas emissions: Even with CCS, the project’s overall emissions are significant, and the failure to meet injection targets has drawn scrutiny.

These issues are not unusual for mega-projects, but they highlight the difficulty of balancing large-scale fossil fuel development with environmental commitments.

Economic and Strategic Importance

For Australia, Gorgon is a major export earner and a key supplier to Asian energy markets. It supports thousands of jobs, both during construction and in ongoing operations, and contributes billions in taxes and royalties. For Chevron, it is a cornerstone of its global LNG portfolio, and for Japan and China, it provides a reliable source of energy.

The project also plays a role in Australia’s domestic gas supply, helping to meet demand in the southern states. However, critics argue that exporting LNG drives up local prices, a debate that continues in Australian energy policy.

Comparisons with Other LNG Projects

Gorgon is often compared to other Australian LNG ventures like Wheatstone and Ichthys. Wheatstone, also operated by Chevron, is smaller and began production in 2017. Ichthys, operated by Inpex, is similar in scale and also faced cost overruns. Globally, Gorgon is among the largest LNG facilities, comparable to Qatar’s Ras Laffan complex, though Qatar’s projects are larger in total capacity.

What sets Gorgon apart is its location on a nature reserve and its ambitious CCS plan, which no other LNG project has attempted at such a scale.

Safety and Regulatory Oversight

Operating on Barrow Island requires strict safety protocols to protect the island’s ecosystem. The project has a quarantine system to prevent the introduction of invasive species, and all equipment is cleaned before landing. Regular audits by Australian regulators ensure compliance with environmental conditions.

In terms of industrial safety, Gorgon has had a relatively good record, though no project of this size is without incidents. The Australian oil and gas regulator, NOPSEMA, oversees offshore safety, while state agencies handle onshore operations.

Frequently Asked Questions

Where is the Gorgon gas field located? The Gorgon field is in the Carnarvon Basin, about 130 kilometers off the Pilbara coast of Western Australia. The processing plant is on Barrow Island, which is about 50 kilometers from the mainland.

Who owns the Gorgon Project? Chevron is the operator with a 47.3% stake, ExxonMobil holds 25%, and Shell holds 25%. The remaining 2.7% is held by Osaka Gas, Tokyo Gas, and JERA.

Why is Gorgon controversial? The main controversies are its high cost, its greenhouse gas emissions, and the underperformance of its carbon capture system. Environmental groups also object to industrial development on a Class A nature reserve.

How much CO2 does Gorgon inject? The design capacity is up to 4 million tonnes per year, but actual injection has been lower. In 2022, it injected about 1.7 million tonnes, and cumulative injection has been well below projections.

Is Gorgon still producing? Yes, as of 2024, the project continues to operate, though Chevron has faced some maintenance and production issues. It remains a major supplier to Asian markets.

What is the difference between Gorgon and Wheatstone? Wheatstone is a smaller LNG project also operated by Chevron in Western Australia, with two trains and a capacity of about 8.9 million tonnes per year. Gorgon has three trains and a capacity of 15.6 million tonnes.